What is rough finishing of an apartment in a new building? What is rough finishing of an apartment With a complete renovation from the developer

IN modern construction Most apartments in new buildings require rough finishing and rough renovation. Undoubtedly, we're talking about not only about purchased apartments in new buildings, but also about secondary housing. Rough renovations in a new building are in particular demand, since this work is the basis for subsequent finishing work in the apartment. It must be done efficiently and professionally, with knowledge of all the necessary subtleties and nuances. And below you will find out how much the rough finishing of an apartment in a new building costs and what it includes.

Rough renovation of apartments includes electrical installation and plumbing work, preparing walls, ceilings and floors for subsequent finishing. Many companies, as well as private craftsmen, are ready to offer their services and provide a high level of quality.

Advantages of rough finishing in a new building

Such repairs will be especially convenient for those who plan to postpone the purchase. building materials for the finishing of housing and payment for work on them. It will also be useful if you need to evaluate the integrity and professionalism of the performers, and in the future perform the final finishing of the apartment with them.

We list the main advantages of this finish:

  • Possibility to postpone the purchase of building materials for finishing at a more convenient time.
  • Carrying out and paying for finishing finishing work later, at any time, which allows you to accumulate funds that are missing for finishing work.
  • Assessing the integrity and level of professionalism of the rough finishing contractor, with the aim of continuing subsequent cooperation in the form of final repairs.

Main types of work during rough finishing in a new building:

  • Dismantling work, demolition and construction of partitions;
  • Insulation, sound insulation of ceilings, walls, floors (if necessary);
  • Wall plaster, primer;
  • Plastering slopes (windows and doors);
  • Distribution of sewerage and water supply to points;
  • Installation of plumbing ducts;
  • Electrical installation work (cutting and laying low-current and power cables);
  • Installation of an electrical panel with connection of RCDs, electric circuit breakers;
  • Waterproofing wet areas. Installation of floor screed;
  • Lifting and loading and unloading operations;
  • Garbage removal.

By choosing a responsible company, you can turn a noisy, dirty and dusty black renovation in a new building into a worthy option for further finishing.

So, how much does the rough finishing of an apartment in a new building cost?

It’s worth saying right away that prices for this type of repair start at 2,500 rubles per m2 of flooring. Here are some illustrative examples:

  • One-room apartment of 44 m2 - from 95 thousand rubles.
  • Two-room apartment 62 m2 – from 150 thousand rubles.
  • Three-room apartment 85 m2 – from 190 thousand rubles.
  • Studio apartment 32 m2 – from 72 thousand rubles.

Turnkey rough finishing times directly depend on the list of types of work and the area of ​​the room. Standard one-room apartment 44 m2 can be finished in one or a month and a half.

You can get more detailed information about the price of rough finishing from us by writing through a special form on the Remontik website.

Features of rough renovation in a new building:

  • It is worth saying that the rough finishing of an apartment for subsequent finishing has some peculiarities, and in order for the work to be completed quickly, efficiently and accurately, the customer needs to know what will be in the apartment and how it will be located.
  • If the apartment is to be redeveloped, it is necessary to have a schematic design project or plan for the future apartment.
  • It is important to know where exactly the partitions will be located: which ones are being erected and where, which ones are removed, which ones remain in their original places.

From this article you will learn:

  • What is included in the concept of rough repairs
  • What stages are included in the rough renovation of an apartment?
  • Where to start renovations in a new building
  • Is it possible to save money on rough renovation in the apartment

Homeowners who dream of comfort in their apartment need to understand that a well-planned renovation with a professional step-by-step finishing will lead to decent results. It is worth paying attention to the stages of rough repairs, because they are the basis for subsequent actions in finishing work and the implementation of design solutions.

What does rough repair mean?

From a layman's point of view, rough renovation is preparation for the final finishing of walls, ceilings, and floors in an apartment. Working surfaces are cleaned and leveled. If the house is old, then the electrical wiring, sewer, water supply and heating communications are changed. Rough finish is carried out in stages and requires significant costs. The subsequent quality of finishing and durability of the interior depend on the attitude towards repairs.

Each stage of rough repair is accompanied by the formation of a large volume of dust, dirt, residues from old decoration(for example, a lot of debris remains after gating). However, at these stages there is a thorough preparation of the working surfaces for the final finishing of the room.

Rough finishing includes the following work:


Stages of rough apartment renovation


The most complex and energy-intensive stages of rough repairs in a new apartment or in apartments that require overhaul. A lot of effort needs to be made to ensure that housing is concrete walls and floors ultimately took on the appearance of a cozy and modern apartment.

What stages of rough renovation do you need to go through to achieve the desired result? It’s worth starting with the preparatory work, during which you need to take measurements of the home and think over the plan or design of the apartment. The plan indicates the number and location of interior partitions, electrical communications, as well as the water supply and ventilation system. As in a design project, it is worth noting the location of equipment and furniture on the plan.

The preparation stage includes choosing materials for finishing and communications, viewing prices for finishing services, as well as the opportunity to make important purchases for housing. This will save effort, time and nerves on the way to the planned repair.


After careful preparation The following stages of rough repairs are distinguished:

  1. Installation of interior partitions. Old partitions are demolished, new ones are erected, load-bearing walls ah, the openings are being arranged. Bricks are widely used for the construction of partitions. aerated concrete blocks, drywall. Each material has undeniable advantages and flaws. During the installation process, not only the wishes of the owner are taken into account, but also the quality characteristics of the constructed walls, as well as compliance with the rules and regulations for safe operation.
  2. At the next stage, work is done with the electrical wiring. The walls are being chipped, wires are being laid, including an antenna cable and for the Internet, and an electrical panel is being installed. The placement of furniture and electrical equipment on the plan should be taken into account, since the layout and number of devices depends on the layout of the wires, the number of sockets, switches, lighting fixtures and their location.
  3. Installation of the heating system, if provided for in the work plan.
  4. Next, cold and hot water supply pipes are laid out and the sewerage system is connected.
  5. If windows need to be replaced, they are dismantled and new double-glazed windows are installed.
  6. Leveling the floor. Rough screed prepares the surface for laying decorative coating.
  7. If the project includes work on noise and heat insulation, then it is carried out simultaneously with the floor screed.
  8. Leveling the ceiling and walls will be the next stage of improvement of the apartment. The ceiling may not be leveled if tension systems are planned to be installed.
  9. The next step is installation heated floors, if they are provided for in the plan.
  10. One of the final points is the installation of sockets, socket boxes, and switches.

Features of rough repairs in a new building


Until recently, new buildings were practically ready for full-fledged housing without the cost of repair work. Currently, new residents are increasingly offered the option without repairs and finishing. The cost of such apartments is significantly lower than the price of furnished housing. But the owners can independently plan and carry out beautification work own home. In this case, you can save a lot of money.

Studios are very popular among apartments in new buildings. This type of housing has no finishing or partitions at all. Painting walls, installing plumbing, leveling ceilings, walls, floors - the new residents will do these jobs themselves. They also carry out both rough and fine finishing. But you should remember about such a stage of rough repairs in a new apartment as pre-finishing work.


When planning renovations in a new building, you should take into account that all finishing will be done from scratch. There will be a lot of work especially when buying a studio. Inexperienced new residents try to purchase expensive materials and make expensive finishing, and this is extremely undesirable.

Even a professional in design and construction will not be able to predict the degree of deformation in this case. He can only guess how exactly the structures and finishes will behave.

The stages of rough renovation in a new apartment will consist of the following sequence of work:

  1. distribution of sanitary and technical communications;
  2. bookmark electrical wires, lighting and power supply systems;
  3. pouring rough screed and laying heated floors;
  4. alignment of wall panels;
  5. installation of suspended or suspended ceilings.

The rough work is done in the first year of shrinkage of the built house, then the pre-finishing is done and only then the finishing work. Dirty work It’s best to do this after receiving the keys to the apartment. The fact is that residents pay for a container designed to collect garbage from construction work.

The management company monitors the removal of garbage and tries to get rid of it within six months. If repairs begin later than for other new residents, then construction waste will have to be removed independently and at your own expense.

It is worth noting another convenience during roughing and pre-finishing work after receiving the keys - this is an uninhabited house. This means you can do finishing work almost around the clock, without fear of disturbing the peace of your neighbors.

Stages of rough renovation in an old apartment


When buying an apartment on the secondary housing market, you should consider necessary steps repair. Maybe that's enough cosmetic repairs, or there will be a desire to completely rip everything off and radically change the finish along with the design. Then you will have to carry out roughing and finishing work in full. Before creating a plan or project, it is better to seek help from professionals. Depending on the goals set, stage-by-stage finishing work is planned.

IN old apartment The stages of rough repairs will be carried out as follows:

  1. dismantling of old partitions and materials, removal to special places for construction waste;
  2. replacement of windows (if necessary);
  3. installation of new partitions;
  4. screeding walls and floors with cement and leveling them;
  5. wiring of electrical communications, installation of sockets;
  6. leveling and plastering of walls;
  7. installation of plumbing and air conditioning.

Based on the results of the work performed, you can evaluate the quality of future finishing and choose the right one. interior solution. Therefore, it is important to entrust repairs to real professionals. Otherwise, minor flaws in the work will ruin not only the future mood, but also the very exquisite interior in the apartment.

Regulations


In recent times, the quality of work was assessed using improvised means. For example, some customers used a hundred dollar bill to evaluate the smoothness of plaster walls. The three-meter rule was applied to the wall, and a bill was used instead of a probe. The quality of work was considered low if the banknote passed through the gap.

There are situations that are the opposite. Specialists without experience try to hide or correct defects in rough finishing next stages repair. There are different extremes. Therefore, it is advisable to adhere to the standards and requirements when performing work. building regulations(SNiP), trying to maintain a balance between quality, cost, complexity and labor intensity of repairs.

Regulatory documents that you should familiarize yourself with:

  • SP 71.13330.2011 controls the quality of insulating and finishing coatings.
  • SP 73.13330.2016 regulates the requirements for the technology and quality of water supply, sewerage, heating, air conditioning and ventilation systems.
  • SP 76.13330.2016 introduces the rules for organizing the electrical network in an apartment.

Everyone decides for themselves whether to adhere to these rules, but reading about generally accepted standards will be useful. This way you will have an idea of ​​the requirements for the quality of work. This applies to both the customer and the contractor.

How to save on rough renovation of an apartment


Cooperating with the “My Repair” Company is reliable and prestigious. The specialists working here are professionals the highest level. The company "My Repair" operates throughout Moscow and the Moscow region.

Quite often, when buying a new home, people learn about the concept of “rough finishing”. Primary (rough) finishing is a set of works to prepare surfaces for subsequent finishing. But not in all cases you need to immediately go for an examination. new apartment to understand what rough finishing is and what this type of repair includes. You just need to find out more about it.

Features of housing with rough finishing

Wall surfaces in such residential buildings, as a rule, are already covered with plaster, but they are still very far from ideal. Because all the defects will have to be leveled plaster mixture and putty. With ceiling structures, everything is much worse, since the differences in these surfaces can be very significant.

Electrical wiring in the “rough” apartments has already been carried out, and all electrical points have been installed in areas necessary cables. The flooring in new apartment buildings deserves special attention, since:

  • a lot of dust and construction debris has accumulated on it;
  • often it needs leveling.

Heating radiators in such rooms are installed at the cheapest prices, so you will most likely decide to replace them with cheaper ones. modern models. This is what an apartment with rough work often looks like. Representatives of the developer company are not particularly interested in the quality of repairs, so the owners of new housing have a lot of work to do.

What to do before repair

Before you begin the rough finishing of the apartment, you should think carefully and depict on the diagram the locations of furniture items, indicate points for mounting switches and electrical outlets, and also decide where it will be more convenient for you to put the TV, landline telephone, Personal Computer and lighting equipment.

You will also have to think about appearance and interior dimensions door designs, select high-quality plumbing fixtures and schematically depict its installation. Take into account the type of ceiling that will be installed in the new apartment: plaster, suspended, tension. The walls also deserve attention: wallpapering, painting, tiling or decorative plaster. Don't forget about floor covering: underfloor heating system, parquet, laminate, linoleum, etc.

Rough finishing must be done using high-quality and reliable materials according to a specific algorithm. If you neglect this, then later you will have to redo something when furniture and household appliances are already delivered to your home.

List of facing activities

In fact, rough finishing represents preparation apartments for decorative (finishing) design. Such repairs may involve a variety of repair and preparatory activities, so rooms with rough cladding can be very different from each other. However, there is a mandatory set of works that must be carried out so that the new owner can begin cosmetic cladding immediately after concluding the purchase/sale agreement.

In order for real estate to be sold to a future owner, it must be built in full accordance with the terms of the project from one of the design institutes. That is, the actual layout of the apartment must fully comply with all design and calculation solutions. On the market today real estate Mostly apartments with an open plan are presented. Thus, only load-bearing wall structures are erected, and the construction of partitions between rooms is the work of the new owner.

The mandatory components of any rough finishing include:

This is just a rough list of what is expected. rough work. Premises that are much less prepared for subsequent repairs are very rare.

Features of rough wall finishing

It is generally accepted that walls are the most important surfaces in any apartment, because they are responsible for its overall attractiveness and have significant functional purpose, separating zones and rooms from each other. Wall structures in modern high-rise buildings they can be made from a variety of building materials. Often on the market there are apartments with plasterboard, concrete, panel, block or brick partitions.

The most the main task any rough processing of walls - their alignment. During the construction of buildings, workers are not very keen to make them perfectly level, so partitions are often not without flaws. Developers often try to save on repairs and meet the shortest deadlines, which is why the rough finish in most cases is not particularly smooth.

The owner is very interested in maximizing quality repairs. Because wall surfaces It is not advisable to immediately finish the rough finish with wallpaper, decorative plaster or paint. Experts advise re-leveling the planes yourself using high-quality consumables, or turning to the services of a team of workers.

Rough ceiling and floor cladding

The initial finishing in this case involves a conventional screed device. For this, the simplest and most economical filling method is used. concrete mixture followed by alignment using beacons. The mixture is supplied to the room by a special compressor. Leveling is carried out through vibration. In general, this technology gives pretty good results - the floor turns out to be very smooth, but defects often remain on its surface due to minor differences in height and the presence of unevenness.

Such a screed can provide the floor with fairly good performance properties. The owner of the apartment must decide for himself whether to install flooring material directly onto the rough finish or first level the surface. If a decision has been made to eliminate floor defects, they can be eliminated using a self-leveling floor system or special mixtures with a self-leveling effect.

The ceiling is the most problematic element of any rough finishing of a home in a new building. Structures built in accordance with the design may have very significant deviations and shortcomings. Even in the most modern buildings, the evenness of this surface can amaze even experienced repairmen. Draft ceiling trim often involves sealing cracks and crevices between floor tiles, then the coating can be whitewashed or covered with a plaster mixture.

For that, to save effort and time, some owners use a trick - install suspended ceiling structures. This technology includes the installation of finishing sheets on a pre-assembled structure, that is, the evenness of the overlapping slabs will not have any effect on visual parameters premises. When installing suspended ceilings, there is also no need to level the floor. However, in other cases, the surface often requires preliminary preparation.

In general, the primary finishing, which prepares the apartment for subsequent finishing cladding, significantly facilitates repair work and relieves the construction site of most of the shortcomings and defects that appeared during the construction stages.

Rough apartment finishing allows you to make a full-fledged room from a concrete box, which contains:

  • water supply;
  • heating;
  • doors and windows.

It can also connect electrical equipment , install plumbing, connect a radio, telephone, etc. However, this does not mean that repairs can begin immediately after signing a real estate purchase and sale agreement. Often the surfaces need to be thoroughly leveled in order to create a truly attractive and high-quality interior after the finishing cladding.

  • 1 The concept of rough finishing
  • 2 Legal definition
  • 3 Types of rough work
    • 3.1 Rough wall finishing
    • 3.2 Rough finishing of the ceiling
    • 3.3 Rough floor finishing
    • 3.4 Heating system and water supply
    • 3.5 Windows and doors
    • 3.6 Electrical wiring
  • 4 Independent rough finishing of an apartment in a new building

When buying an apartment, you usually get an area with a standard layout and finished finishing. More often, Finishing work not carried out in the best possible way. In order to reduce the cost of construction work, they use materials that are not the same good quality. But now there is an opportunity to purchase housing in a house under construction. Such housing is cheaper, since only the rough finishing of the apartment is done inside. This allows you to plan rooms and design the interior according to an individual project.

Basic work has been completed in the apartment, but the owner has a complex of interior finishing work to do

The concept of rough finishing

In modern housing construction, a finished apartment is a box with a minimum interior decoration. Only the mandatory rough work has been completed, which allows the housing to be put into operation.

Rough finishing of a room is basic work that is performed before decorative finishing. It consists of several stages, carried out in accordance with the joint venture, which regulate the production of work.

Legal definition

There is no clear unambiguous definition of the work that includes rough finishing. Different developers carry out basic work in accordance with their own estimates. But construction work must be regulated regulatory documents(Set of Rules):

  • Apartments from the developer in a new building must comply with SP 54.13330.2011 and SP 55.13330.2011.
  • Heating and ventilation are installed in accordance with SP 60.13330.2012.
  • Conclusions of plumbing and sewer systems regulated by SP 30.13330.2012.
  • Floor screeding is carried out according to SP 29.13330.2011.

Types of rough work

Primary finishing in a new building is intended to prepare all structural elements and surfaces for further repairs. It includes the following types of work:

  1. Construction of interior partitions.
  2. Leveling and finishing walls and ceilings, as well as floors.
  3. Installation of water supply system and plumbing equipment.
  4. Installation of electrical wiring.

The apartment was handed over after rough finishing, there are interior partitions and electrical wiring

Rough repairs must be carried out with special care. A new building is subject to shrinkage in the first year, so if the work is done poorly, cracks may form in the plaster or screed.

Rough wall finishing

An apartment in a new building may not have interior partitions, so you can choose the appropriate layout yourself. To build walls, you can use brick, cinder block, plasterboard, foam concrete or aerated concrete blocks. After construction, the wall needs to be plastered. Stages of wall finishing:

  1. Basic plaster. To do this, a high-quality composition is applied to them, in compliance with the right technology. If the apartment already has interior partitions, then plastering the walls is not necessary.
  2. Leveling the walls, which is done with finishing putty. This layer is necessary to ensure that the surface becomes smooth and suitable for further decorative design.

Rough ceiling finish

The most problematic part of the rough finishing of a room is the ceiling. Floor slabs can be laid with large differences (up to 5-8 cm). Ceiling finishing involves the following steps:

  1. Sealing joints between slabs. It is customary to simply plaster the tile joints, but this option is the simplest. Modern technologies provide for preliminary foaming of the seam. Next, it is plastered using a wide serpyanka reinforcing the seam.
  2. Ceiling leveling. This procedure is necessary when large differences between the plates. Leveling is performed with an elastic composition based on gypsum. Painting mesh is used as a reinforcing layer. In order for the plaster to adhere tightly, the ceiling is pre-treated with a primer.

After rough finishing, the ceiling was sanded, electrical wires were routed out for lighting

To give the ceiling an ideal smooth texture, it is carefully sanded. If you are planning to install tension or suspended ceilings, then this finishing option does not require preliminary preparation.

Rough floor finishing

To create an intermediate level between the slabs and the finishing coating (linoleum, laminate), a floor screed is needed. She levels out horizontal level and corrects existing defects (potholes, cracks). The screed can be made of concrete or more modern material– self-leveling bulk mixture. Drying of the layer lasts for 10 days.

During the finishing work of screed installation, you can install a heated floor system. If the screed in a new building is provided by the developer, the heated floor can be installed in an additional leveling layer.

Heating system and water supply

All engineering Communication already summed up. All that remains to be done when the apartment is finished is to install the plumbing and faucets. During the installation process, it may be necessary to extend the water supply system pipes or upgrade heating elements.


After rough finishing, the apartment is rented with a separate heating system and, usually, with the cheapest heating radiators

Attention!New apartments with rough plumbing may not have water meters. You can choose the installation location yourself, observing regulatory requirements.

Windows and doors

The rough finishing of the apartment includes the installation of doors and windows. In modern new buildings they install plastic windows. The project may also include insulation and glazing of balconies and loggias. The type of doors depends on the choice of the developer. Some new apartments have interior doors not provided.


Apartments in new buildings are rented with doors, they are usually relatively cheap metal doors with one lock

Wiring

Installation of electrical wiring during rough finishing can be done in two ways:

  • Electrical wires are brought into the room and insulated. Further installation is left to the discretion of the buyer.
  • Full electrical wiring is carried out, with outlets for sockets, switches and lighting fixtures. It is done before plastering the walls, enclosing the wires in cable channels. Special documentation is issued for the finished electrical wiring, indicating the exact location of the entire system.

Interesting! The electricity meter can be located both in the apartment and on the site in the entrance.

Independent rough finishing of an apartment in a new building

Is it worth doing renovations in a new building using stages of work that include rough finishing? This is advisable in cases where the developer only constructs the building without finishing. It may also be the low quality of the initial repairs in the apartment. In this case, dismantling work may be necessary.

High-quality finishing work is good help during the finishing process. If you perform them yourself, follow all regulatory requirements.

- This best option at a cost that makes it possible to create an environment that meets all the buyer’s parameters interior design and design. Such objects are offered in two versions: rough and fine finishing.

Each type includes a set of works, which is determined by the developer. However, the final housing option may be different. To avoid disappointment, the buyer needs to clarify: finishing, rough finishing, what is included, and in what form the object will be delivered.

In contact with

Types and description

Rough finishing may imply different types repair work carried out in a new building.

Her mandatory elements are:

  • : made on the same level around the entire perimeter of the apartment, based on cement with the addition of sand;
  • , windows made of wood, plastic, entrance doors may be metal;
  • ceiling treatment: caulking of floor joints, plastering. Usually has significant deviations in horizontal and surface evenness;
  • : alignment vertical surface using limestone or cement mortar. Finishing will be required.

The rough finishing of the apartment from the developer includes all necessary communications: electricity, water supply, heating, gas.

Batteries are installed, others heating devices. Telephone and television cables are supplied, which require additional wiring around the entire perimeter of the apartment.

This type of finishing may include other additional measures. It is important to clarify this issue, discuss it with the developer, and when concluding a purchase agreement, carefully study the characteristics included in this concept

Advice! When receiving and transmitting an object necessary work must be implemented in full.

Clean finishing in a new building involves Carrying out the work necessary to treat all surfaces, including their decoration. This applies to walls, ceilings, floors in rooms, kitchens, and bathrooms. The installation of a stove, intercom, and meters is being done. As a rule, this is an economical option, since inexpensive and not always quality materials. This housing can be immediately used for living without additional repair work.

Prices for cement-sand mixture

cement-sand mixture

Improved version

This is one of the apartment design options that is most popular among buyers. All dirty, labor-intensive work related to leveling walls, ceilings, and floors is carried out first. They are brought to perfect condition.

Everything in the premises is prepared for the application of decorative coatings. Improved rough finishing implies the presence of meters, sockets, and switches.

Conducted through the rooms, pipes to the bathrooms and kitchen, batteries installed. The main thing is that in this option, the buyer remains freedom of choice. He independently determines what materials will be used for interior decoration.

Process description

Rough finishing, which includes.

In this embodiment, the apartment, namely the floor, walls and ceiling, looks something like this:

  1. The ceiling may have unevenness, external defects, and dents. To level and achieve an ideal state, it needs a starting, finishing putty, after which it can be applied decorative coating.
  2. The walls and interior partitions do not have a perfectly flat surface; at best, they are plastered, so they need to be covered with starting and then finishing putty.
  3. The floor as a whole and the screed are fairly level, so the owner will decide whether it needs to be leveled for a decorative coating. It all depends on his personal preferences and financial capabilities.

Important! Rough finishing of walls, partitions, floors, ceilings is aimed at preparing them for the final coating.

Visible, large defects are eliminated, no attention is paid to details and minor errors.

What materials are used

Before handing over the apartment to the owner, a list of the main types of work included in the documentation is provided.

The following apply:

  • drywall or plaster.
  • concrete, dry screed or logs.
  • wet mixtures or sheet materials.

Drywall or plaster is used to cover walls. Drywall is mounted on guide profiles or special glue. Working with it does not require preliminary dilution of any solution, and the degree of evenness of the walls does not matter, due to which it takes less time to install it. Plaster is made from limestone, gypsum or cement-sand mixture. It is more durable, stronger, and cheaper. The main thing is that in the end the rough finishing of the walls ensures the maximum flat surface vertically and horizontally, which will affect the durability of the finish coating.

Concrete screed strong, durable, most often used in apartments. Consists of waterproofing, expanded clay, concrete, self-leveling mixture. Dry screed includes waterproofing, dry backfill made of expanded clay or quartz sand, sheets of plywood, and gypsum fiber.

The logs represent wooden blocks same size, made from different breeds tree. For the coating, waterproofing, beacons and sand for leveling, logs, and plywood are used.

Wet mixtures and sheet materials are used to level the ceiling.

What materials will be used must be clarified with the developer. This important point, as it renders impact on the quality of purchased housing, the amount of subsequent costs for finishing work.

Drywall prices

drywall

Stages of work

Where to start doing the work.

Finishing in a new building always begins with dirty work:

  • installation of interior partitions;
  • distribution of water supply, electricity, sewerage, heating communications;
  • installation of windows and doors.

Then the work is carried out in sequence from top to bottom: they start with the ceilings, then move on to the walls, and at the final stage they proceed to the floor.

The ceiling and walls, first of all, need to be leveled. This is done in two ways: wet or dry. For wet method plaster is used, and for dry use sheet materials, for example, plasterboard.

The floors are tidied up last resort using screed or plywood. All these surfaces are not brought to ideal condition, therefore need finishing coating from special materials.

Prices for plywood sheets

plywood sheets

Final finishing

What does it mean to clean an apartment? It includes carrying out the dirty, rough work listed above. Additionally, installation and dismantling of non-load-bearing walls and partitions can be carried out, that is, the premises can be redeveloped, doors, windows can be installed, all surfaces can be leveled and decorated.

After this, the finishing work begins:

  • laminate and linoleum are laid on the floor;
  • the walls are covered with wallpaper, paint or tiles;
  • sockets and switches are installed;
  • a gas or electric stove is connected;
  • doors, windows are painted or installed from materials that do not require additional processing. for example, plastic;
  • All plumbing is connected.

This design makes the property suitable for the owner to live in immediately after purchase and moving.

Attention! When finishing the project, the developer uses standard materials that are not of high quality.

Materials

For home decoration many different ones are used decorative materials , each of which has its own purpose, advantages, characteristics. They may differ from each other in composition and method of application.

Ceiling and walls

After leveling with the starting and finishing putty, the ceiling is primed and then covered with water-based paint and wallpaper. For these purposes, polystyrene foam boards, stretch and suspended ceilings can be used.

Wallpaper is used as a decorative treatment for walls. different composition, water-based paint, decorative putty, ceramic tiles, plastic or wooden panels. The purpose of the room is taken into account.

For example, in the kitchen and bathroom the walls are covered with materials that are resistant to high humidity, chemicals and temperature changes.

Prices for primer for walls

primer for walls

Floor

The floors in new buildings are covered with laminate, carpet, linoleum, and parquet. They are also used in guest rooms, children's rooms, and bedrooms. In the kitchen, bathroom, hallways the floor is covered ceramic tiles. At the final stage, plastic skirting boards are installed.

For getting good result, necessary carry out work in a certain order, in compliance simple rule: top down. As a result, the apartment looks neat and can be used for furnishing and living.

Useful video: renovation of a rough apartment in a new house

Whatever type of finishing is used to decorate apartments in a new building, the main thing is that the result suits the buyer. For services of this kind, you need to turn to trusted companies that hire qualified specialists, use high-quality materials, and have a good reputation.