How to turn on the heating on a Beretta boiler. Beretta double-circuit boiler instructions. Operating instructions for Beretta gas boilers. Adjustments and maintenance of the Beretta Chao boiler

You have been facing problems for a long time central heating or hot water supply? These issues can be resolved by installing gas boiler.

Problems with central heating

The solution could be a single-circuit or double-circuit boiler. The first type is capable of providing the heating process. Using a dual-circuit device, you can provide not only space heating, but also heating of the coolant for solving everyday problems. If you decide to purchase a Beretta double-circuit gas boiler, then you should remember that its installation will be quite a troublesome and time-consuming process.

Reviews about the rules for installing a gas boiler

Many people like the products trademark"Beretta". A gas boiler from this manufacturer can be purchased at an affordable price. Before you begin installing the device in a private home, you will need to prepare some documentation and carry out certain actions. Thus, you will need a gas supply contract for the developer and an installation project. Specifications must be agreed upon with a gas service representative.

Project documentation is most often developed by specialists from institutes that operate under the appropriate license. Gas equipment must be installed by professionals from installation organizations.

According to users, an engineer from the district organization must visit the site in order to check whether gas is supplied correctly to the kitchen and furnace room, and whether the requirements are met. Quite often in Lately consumers choose Beretta brand products, and the gas boiler is no exception.

After the specialist is convinced that all standards are met, he will issue a conclusion, based on which it will be possible to open the valve that leads to the equipment. The heating system must be pressurized to P = 1.8 atm.

It will be important to de-air the heating system. Advanced users emphasize that the connections must be checked for leaks, it is necessary to install a voltage stabilizer for the equipment and a source that will be responsible for it. It is worth remembering that under no circumstances should antifreeze be added to the heating fluid.

Reviews on the rules for designing a boiler room

When to purchase wall gas boilers"Beretta", they must be installed in premises that have certain requirements. In a private single-apartment house, the boiler room or furnace room can be located on any floor, including the basement, roof, attic or basement. The restriction applies only to residential premises, as well as to the bathroom and bathroom, where it is prohibited to place the boiler. Consumers emphasize that it is important to determine the volume of the boiler room, taking into account thermal power equipment, capacity of water heaters, as well as flow tanks.

For reference

If you decide to install a Beretta gas boiler, then keep in mind that when installing it it is important to take into account some factors. So, if the device has a closed combustion chamber, then the volume of the boiler room is not standardized. It is not necessary to have a window. To remove and supply oxygen, it is important to ensure air flow in the required volume.

Thus, if you installed a boiler with a power of 23.3 kilowatts, then the gas will burn in a volume of 2.5 cubic meters per hour. In order to ensure complete combustion given volume, you need 30 cubic meters air per hour. If you do not guarantee sufficient air supply, the gas will not burn completely and will begin to concentrate as a result. harmful substance, its inhalation can negatively affect human health. If inhaled for just 15 minutes, death can occur. Oxygen must penetrate not only from outside, but also from other areas of the house. This can be ensured by having a gap that will be located between the door and the floor surface. It is also recommended to install a grille at the bottom of the door.

The Beretta gas boiler must be installed on the floor with a distance of ten centimeters from the wall, which should be made of non-flammable material. If there are no such surfaces, then you can install special protection, which will be made of fire-resistant material.

Installation instructions

If the listed requirements are not met, the gas service will not allow you to connect the boiler to the central line. However, the need to comply with these requirements is dictated not by bureaucracy, but by experience, as well as fire safety. The restrictions apply not only to equipment and installation work, but also the premises where the boiler is supposed to be installed.

It must be remembered that the area of ​​the boiler room must be 4 square meters or more, and the ceilings must be at least 2.5 meters. When installing the door, keep in mind that its width should be 80 cm or more. If you decide to prefer the Beretta manufacturer, a gas boiler from this company will meet all safety requirements, but it is important to comply established rules. They require the equipment to be illuminated naturally through a window opening. On 10 square meters One room should have 0.3 meters of square window opening. It is very important to organize intensive ventilation, because gas combustion is ensured by the principle of influx fresh air. To ensure the entry of outside air, it is necessary to ensure the presence of an opening of 8 centimeters square per 1 kilowatt of device power.

Additional Instructions

The Beretta gas boiler, which has only positive reviews, must be connected to gas pipeline pipes that are made exclusively of metal. The use of flexible hoses is permissible only for connecting individual consumers. The chimney must have a cross-section that corresponds to the power parameters of the unit. If it is equal to 30 kilowatts, then the diameter of the chimney should be 130 millimeters. When the power increases to 40 kilowatts, the diameter increases to 170 millimeters. It is impossible to allow the cross-sectional area to be less area cross-section of the hole for connecting this element.

If you decide to choose a Beretta gas boiler, the installation instructions for which are presented in the article, then it is important to remember that the upper end of the chimney should be 0.5 meters above the ridge. This value is the minimum.

What else should you pay attention to?

Be sure to ensure the presence of a gas analyzer, which must be located in the boiler room. By using of this device you can prevent gas leaks. The device must be equipped with an electric valve. The latter is designed to shut off the gas supply if necessary.

The manufacturer "Beretta", whose gas boiler you can purchase at specialized sales points, indicates the possibility of placing the equipment in basement exclusively a single-family house. Concerning multi-storey buildings, then installing the device in the basement is prohibited.

Review of the Beretta Ciao CSI gas wall-mounted boiler

Beretta Ciao 24 CSI are wall-mounted gas boilers with forced smoke removal and air intake, designed for heating and production hot water household purposes.

Main components and functionality of the Beretta Ciao 24 wall-mounted boiler:

Microprocessor board that controls inputs, outputs and alarms.

Electronic modulation ensures smooth power control in DHW and heating modes.

Electronic ignition with ionization type flame control.

Smooth automatic ignition.

Built-in gas pressure stabilizer.

Device for pre-installation minimum water temperature in the heating circuit.

OFF-RESET switch for restart after stopping due to an alarm, selection of Summer mode, selection of Winter mode, temperature controller in the heating circuit.

Temperature regulator in the DHW circuit.

NTC sensor for monitoring the temperature in the heating circuit.

NTC sensor for monitoring the temperature in the DHW circuit.

Circulation pump with air vent.

Automatic by-pass of the heating circuit.

Coaxial heat exchanger for heating water in the heating circuit and DHW.

Expansion tank 7 l (24 CSI), 8 l (28 CSI).

Heating system feed tap.

Pressure gauge for monitoring water pressure in the heating system.

There is space for installing a 24 V room temperature thermostat.

The Beretta Chao boiler has been prepared for connecting the following accessories: sensor outside temperature, which allows the function of weather-compensated regulation, remote control.

Anti-jamming protection function for the circulation pump, which is activated automatically every 24 hours after the last pump cycle.

Closed combustion chamber.

Flame control device, ionization type; when the flame goes out, it shuts off the gas supply and gives a light signal.

Hydraulic pressure switch that controls water pressure in the heating circuit.

A limit thermostat that controls boiler overheating.

Smoke removal pressure switch, which monitors the operation of the fan and the smoke removal system.

A 3 bar safety relief valve is installed in the heating circuit.

Frost protection.

Fig.1. Assembly parts for wall-mounted boilers Beretta Ciao 24 CSI

1 - Tap for filling the boiler, 2 - Safety valve, 3 - Valve for draining from the system, 4 - Circulation pump, 5 - Auto-ventilator, 6 - Ignition transformer, 7 - Burner, 8 - Ignition-flame detection electrode, 9 - Limit thermostat, 10 - Heat exchanger, 11 - NTC sensor of the DHW circuit , 12 - Fan, 13 - Tube for measuring vacuum, 14 - Flange flue gases, 15 - Smoke exhaust pressure switch, 16 - Expansion tank, 17 - NTC heating circuit sensor, 18 - Gas valve, 19 - Hydraulic pressure switch, 20 - Flow sensor

Fig.2. Hydraulic diagram of the Beretta Ciao 24 gas boiler

1 - Water inlet from the water supply system, 2 - Water outlet into the DHW circuit, 3 - Direct pipeline of the heating system, 4 - Return pipeline heating system, 5 - Drain valve, 6 - Safety valve, 7 - Circulation pump, 8 - Air vent, 9 - Expansion tank, 10 - NTC sensor of the heating circuit, 11 - Heat exchanger, 12 - Burner, 13 - NTC sensor of the DHW circuit, 14 - Hydraulic pressure switch, 15 - By-pass, 16 - Flow limiter, 17 - Flow sensor, 18 - Filter, 19 - Make-up valve

Installation of Beretta Ciao 24 CSI gas boilers

When operating, Beretta Chao boilers do not use air from the room in which they are installed. Therefore, there are no requirements for these premises additional ventilation. For of this type boilers possible various configurations flue gas removal and air intake.

For correct installation wall-mounted boiler Beretta Ciao 24, it is necessary to take into account that:

It should not be installed above a stove or other cooking equipment;

It cannot be installed in residential premises;

It is prohibited to store flammable substances in the room where the boiler is installed;

If the wall is heat sensitive (eg wooden wall), it must be protected with appropriate thermal insulation.

In order to gain access to the inside of the unit for routine maintenance, it is necessary to leave minimum distances to walls and objects.

As standard, the device comes with a mounting bracket.

To install the Beretta Ciao 24 CSI boiler, follow these steps:

Attach the bracket to the wall and use a level to check that it is in a perfect horizontal position.

Mark the top holes (6 mm in diameter) that are necessary to secure the bracket.

Make sure that all dimensions are determined accurately, then use a drill with a drill bit whose diameter is indicated above to make holes in the wall.

Attach the bracket to the wall using dowels.

Electrical connection of Beretta Ciao 24 CSI boilers

The connection to the power supply must be made via a separate circuit breaker with a contact gap of at least 3 mm. It is used to power the boiler alternating current voltage 230V 50Hz.

Consumed electric power boiler is:

100 W (Ciao 24 CSI)
- 120 W (Ciao 28 CSI)

To gain access to the terminal block, follow these steps:

− Turn the main switch to the off position.

− Unscrew the screws that hold the trim.

− Slide the base of the casing forward and upward to detach it from the frame of the Beretta Ciao 24 boiler.

− Unscrew the screw securing the instrument panel.

− Turn the instrument panel towards you.

− Remove the cover that covers the terminal block.

− Thread the cable of the power supply and the room temperature thermostat you want to connect.

The room temperature thermostat has a safety low voltage input (24 V DC). The ground wire should be a couple of centimeters longer than the others. It is prohibited to use gas and/or water pipelines as grounding for electrical appliances.

The manufacturer cannot be held responsible for any possible damage that may be caused by the boiler not being grounded. If you need to replace the power supply wire, use wire type HAR H05V2V2-F, 3 x 0.75 mm2, maximum outer diameter 7 mm.

Gas connection to wall-mounted boiler Beretta Ciao 24 CSI

Before connecting the Beretta Chao boiler to the gas network, make sure that:

Current standards are met;

The type of gas corresponds to the one for which the device is designed;

The gas pipeline is cleared of dirt.

To avoid unnecessary pressure losses, the gas connection must be made with a rigid connection with a diameter of at least ¾’. Before gas enters the boiler, it is necessary to install a shut-off valve (not included in the delivery package).

We recommend installing a filter of the appropriate size on the gas pipeline if the gas pipeline contains foreign particles. Upon completion of installation, check the tightness of the connections as required by the current installation standards.

Filling the heating system

After making the hydraulic connections, you can proceed to filling the heating system. This operation must be performed when the system has cooled down.

To fill the system, perform the following sequence of actions:

Unscrew the air vent cap two or three turns.

Make sure the inlet valve is cold water open.

Open the valve to fill the system and keep it open until the pressure on the pressure gauge reaches a value of 1 to 1.5 bar.

When the system is filled, close the feed tap.

The Beretta Ciao 24 boiler has an automatic air separator, so no additional operations are required to bleed air from the system.

The burner only ignites when the air venting phase is completed.

Removal of combustion products and air intake

The Beretta Chao boiler must be connected to coaxial or separate flue and air ducts, which must be vented outside through the roof or external wall.

Efficient and safe work guaranteed only if original chimneys and air ducts designed for units with closed camera combustion.

This equipment is not included in the standard package and is available upon separate order. When installing chimneys and air ducts, make sure that all connections are made correctly, in accordance with the attached instructions.

It is allowed to connect several boilers to one collective chimney, provided that they all have a sealed combustion chamber.

Ignition of the Beretta Ciao 24 CSI gas boiler

To ignite the Beretta Ciao 24 boiler, you must perform the following operations:

Turn on the power supply to the unit.

Open gas tap in front of the device.

Set the mode switch knob to the required position:

“Summer” mode: the boiler will be in standby mode until a request to heat water in the DHW circuit appears.

“Winter” mode: set the switch inside a zone divided into segments, the boiler will start operating in heating mode and, when a signal appears, automatically switch to the DHW water heating mode.

Set the room temperature thermostat to desired value(approximately 20°C).

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

_______________________________________________________________________________

__________________________________________________________________________

OPERATION AND REPAIR OF BOILERS

Adjustments and maintenance of the Beretta Chao boiler

Adjustment of maximum and minimum power for the DHW circuit

− Open the hot water tap fully.

− set the switch to Summer mode.

− set the temperature regulator in the DHW circuit to the maximum position.

− Turn the main switch to the "on" position to turn on power supply boiler Beretta Ciao 24 CSI.

− Make sure that the pressure displayed on the pressure gauge is stable; or take a milliammeter, connect it in series to the modulator and make sure that the maximum available current is supplied to the modulator (120 mA for G20 gas and 165 mA for liquefied gas).

− Remove the protective cap from the adjusting screws on the gas valve by carefully prying it off with a screwdriver.

− Using normal wrench CH10 rotate the maximum power adjusting nut to obtain the desired pressure value.

− Disconnect one terminal from the modulator.

− Wait until the pressure value displayed on the pressure gauge stabilizes at the minimum level.

− Using a screwdriver or a special wrench, turn the red minimum power adjustment screw until the required pressure value is displayed on the pressure gauge.

− Reconnect the terminal to the modulator.

− Close the hot water tap.

− Carefully and carefully place the protective cap in place on the adjusting screws.

Electronic regulation of the minimum and maximum power of the Beretta Chao boiler in heating mode

The electronic regulation function can only be enabled or disabled using jumper (JP1). The green and red lights on the control panel will flash alternately.

This feature can be enabled in one of the following ways:

− It is possible to supply power to the board when jumper JP1 is installed and the operating mode switch is in the winter position, regardless of whether there are any requests to operate in a different mode or not.

− By installing jumper JP1, the operating mode switch should be in the “winter” position and there should be no current requests for heat production.

When this function is turned on, the burner is ignited due to the fact that a request for heat production for the heating system is simulated.

To complete the setup procedure, follow the instructions below:

− Switch off the Beretta Ciao 24 CSI boiler.

− Remove the trim to gain access to the electronic board.

− Install jumper JP1, and the knobs located on the control panel will begin to perform the functions of regulating the minimum and maximum power in heating mode.

− Make sure that the operating mode switch is in the “winter” position.

− Turn on the power supply to the unit. The electronic board is under voltage (230 Volts).

− Turn the temperature control knob in the heating circuit until the minimum gas pressure value for heating mode is reached.

− Install jumper JP2.

− Rotate the temperature control knob in the DHW circuit until the maximum gas pressure value for heating mode is reached.

− Reconnect the pressure compensation connection to the air intake chamber.

Disconnect the pressure gauge and tighten the screw on the pressure fitting.

To exit setup mode without saving the settings, do one of the following:

Set the operating mode switch to the (OFF) position.

Turn off the power.

Remove jumper JP1/JP2.

The setting mode ends automatically, without saving the minimum and maximum values, after 15 minutes have passed after it has been activated.

The setting mode ends automatically also in the event of a preliminary or final emergency stop. In this case, the specified parameters will also NOT be saved.

To set only the maximum power in heating mode, you can remove jumper JP2 (in order to save the maximum), and then exit the setting mode without saving the minimum, by setting the operating mode switch to the (OFF) position or turning off the power supply to the boiler Beretta Ciao 24. After each change in the gas valve adjustment, install a seal on it.

After completing the adjustments:

− Return the temperature set on the room thermostat to the desired value.

− Set the water temperature regulator in the heating system to the desired value.

− Close the control panel.

− Reinstall the trim.

Maintenance of Beretta Ciao 24 CSI boilers

In order for the Beretta Chao boiler to operate reliably and efficiently, it must be systematically maintained at regular intervals.

The frequency of maintenance depends on the specific installation and operating conditions, but in any case it is recommended that a qualified technician service department carried out maintenance at least once a year.

In case of repair or technical structural maintenance located near the chimney and/or devices for removing flue gases and their components, turn off the device, and upon completion of work, a qualified specialist must check the operation of the boiler.

Before performing any cleaning or maintenance operation on the boiler, set the operating mode switch to the OFF/RESET position and turn off the general switch and turn off the gas supply pipe using the tap installed in front of the device.

With planned maintenance Beretta Ciao 24 CSI boiler performs the following operations:

Removing oxides from the burner;

Removing scale from inside the heat exchanger (if necessary);

Check and general cleaning chimneys and air ducts;

Examination appearance unit;

Diagnostics of ignition, shutdown and operation of the Beretta Ciao 24 CSI boiler, both in DHW mode and in heating mode;

Monitoring the tightness of connecting adapters and gas and water connection pipelines;

Checking gas flow at maximum and minimum power;

Monitoring the position of the ignition-flame detection electrode;

Diagnostics of safety device activation in case of gas loss;

Checking combustion parameters

To perform an analysis of combustion products, perform the following sequence of actions:

− open the hot water tap to maximum.

− set the operating mode switch to “summer” mode.

− set the temperature regulator in the DHW circuit to the maximum value.

− Unscrew the screw on the cover that covers the fitting used for sampling combustion products for analysis and install the gas analyzer probe.

− Turn on the electrical power to the boiler.

The boiler will operate at maximum power, which will allow analysis of combustion products. After completing the measurements, close the hot water tap, remove the gas analyzer probe and close the fitting used to select combustion products for analysis, carefully tightening the screw that was previously removed.

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

_______________________________________________________________________________

__________________________________________________________________________

OPERATION AND REPAIR OF BOILERS

Proterm Panther