An estimate is one of the most important documents from which the repair, construction or reconstruction of any facility begins. Drawing up an estimate for apartment renovation is a mandatory procedure that is primarily necessary for the Customer. This fundamental document must be prepared as an annex to the contract.
ORDER AN APARTMENT RENOVATION
Calculation of estimates for apartment renovations is carried out by a specialist - estimator. To begin with, our specialist goes to the repair site, inspects the premises, takes measurements of the premises, gets acquainted with the condition of the floors, ceilings, walls, windows and doors, finds out the individual wishes of the Customer and receives technical specifications.
Based on all the information received and measurements of the premises, project documentation and an estimate is drawn up for major renovation apartments. You can, perhaps, do without an estimate only if you are carrying out small redecorating or partial renovation of the interior. But still, an estimate is always needed; a description of the types of work included in the estimate undoubtedly provides a number of advantages when working on a construction site during repairs. Thanks to the preliminary estimate, the Customer receives detailed information on the list of types of work and materials required for repairs, and also sees an accurate calculation of the cost of these finishing works and materials.
Typical commercial estimate It looks like an Excel table, which must indicate the types of work, units of measurement and cost. Our company uses the services of experienced estimators; we also constantly monitor prices for building materials, which allows us to significantly save money.
You, as a customer, have the opportunity to control the progress of work and expense items. When choosing contractor to carry out the work, it is the analysis of the estimate that gives a complete picture of the cost of the work and allows us to evaluate the professionalism of the contractor.
We can immediately tell you that the prices for comprehensive renovation significantly lower than for certain types of work. Each order is individual! The cost of services depends on the types of work and their volume. Moreover, the larger the volume, the lower the price for repair and finishing work.
Sample estimate for finishing work
No./pos. |
Name of works |
unit. |
Quantity |
Price, rub |
Amount, rub |
Dismantling work, garbage removal |
|||||
Cleaning |
|||||
Cleaning walls down to concrete (from wallpaper, putty) |
|||||
Cleaning the ceiling down to the concrete (high-pressure paint, putty |
|||||
Cleaning the floor down to concrete (from the old coating) |
|||||
Other dismantling |
|||||
Dismantling the baseboard |
|||||
Taking out the trash |
|||||
Removal of construction waste |
|||||
Electrical work |
|||||
Wiring of electrical, telephone and television networks in walls and ceilings |
|||||
Installation of sockets, switches, spotlights, automatic machines |
|||||
Plastering walls and leveling the floor (screed) |
|||||
Primer for concrete walls and ceilings |
|||||
Leveling ceilings (improved plaster) |
|||||
Wall leveling (improved plaster) |
|||||
Painting works |
|||||
Wall putty |
|||||
Ceiling putty |
|||||
Pasting walls vinyl wallpaper |
|||||
Ceiling painting water-based paint in 3 layers |
|||||
Cleaning and painting pipes with heat-resistant paint |
|||||
Carpentry work |
|||||
Laying the ceiling cornice, filling and painting (foam or polyurethane, width up to 3 cm) |
|||||
Masonry ceramic tiles on the floor |
|||||
Cleaning |
|||||
Repeated cleaning throughout the renovation and at the end of the renovation |
|||||
Total for finishing work: |
|||||
CUSTOMER |
CONTRACTOR |
||||
__________ |
__________ |
Sample estimate for rough material
No./pos. |
Name |
unit. |
Price according to estimate, rub |
Estimated amount, rub |
|
Materials according to the main estimate |
|||||
Plaster mixture "Rotband" |
|||||
Betonokontakt mixture, 5kg |
|||||
Insulating tape |
|||||
Mounting boxes |
|||||
Junction boxes |
|||||
Alabaster G-5 ( gray) 20kg each |
|||||
Copper wire in double insulation PUNP 3x1.5 |
|||||
Copper wire in double insulation PUNP 3x2.5 |
|||||
Putty "Vitonit-LR" (Fin.) |
|||||
Ready-made finishing putty SHEETROCK 5.6kg (3.5l) ready putty |
bucket 3.5l |
||||
Primer deep penetration, canister 10l |
|||||
Latex-based water-based paint Fincolor Euro-7, white matte 9l |
|||||
Tile adhesive Fliesenkleber KNAUF, 25kg |
|||||
Polyethylene rolls 3 m wide |
|||||
Dowels, screws, self-tapping screws, nails, bolts and other fasteners |
|||||
Consumables and auxiliary materials, one-time tool |
|||||
Total for construction and finishing materials |
|||||
Transport costs, loading, overhead, contingencies, tool depreciation, budgeting, etc. from the cost of materials |
|||||
Total with transportation costs and other expenses |
|||||
Dismantling, construction and finishing works, waste removal |
|||||
|
TOTAL according to estimated costs |
|
|
|
59749 |
CUSTOMER |
CONTRACTOR |
||||
__________ |
__________ |
For an approximate estimate of the cost of renovation of premises, use our online calculator. On our online repair cost calculator, you can calculate approximate cost repair work with rough materials. You just need to choose the type of repair (cosmetic repairs, major repairs, European-quality renovation), select the name of the room in which you are going to make repairs, then enter the area of the room in square meters by floor, and the rest Online calculator it will calculate everything itself and display it in the column Total approximate estimated cost your renovation of premises.
Premises renovation cost calculator - online
If you do not want to manually calculate the floor area or you did not understand something when describing the calculations, then you can use our calculator and calculate floor or ceiling area automatically.
For calculation it is necessary measure in meters length, width of the room and enter the data in order by filling out the form and you will automatically receive a calculation floor or ceiling area in square meters.
Calculator for calculating floor and ceiling area
N We won’t bog you down with tedious mathematical calculations. You just need to measure the basic parameters, and the wallpaper calculator itself will roughly calculate required quantity wallpaper for your room. Those who want more accurate calculations and measurements can read the article above How to calculate how much wallpaper you need.
When planning the renovation of his apartment, the owner sometimes, in last resort thinking about renovating the balcony. This is understandable; there is often not enough money for everything at once. But is it worth putting off finishing this room for later? After all, a balcony can be turned into a full-fledged addition to our square meters.
Today it has become popular to expand the living space of an apartment by adding a balcony or loggia. But not everyone knows what renovation work for this you need to do. For the average person, work on insulating a balcony comes down to banal glazing and filling cracks polyurethane foam and installation of decorative cladding.
In reality, everything looks much more complicated. One of the main tasks is proper insulation of the balcony. Without this, expand the living space by getting a full-fledged recreation area, a small dining room or sports section, impossible.
Today the market offers a large number of insulation materials of various qualities. Each of them has its own advantages and disadvantages. These include:
- polystyrene foam is a foamed material with a cellular structure. Very light - easy to install. Does not withstand mechanical stress, durable decoration is required;
- extruded polystyrene foam - thermal insulation with completely closed cells. Required additional protection- direct sunlight destroys upper layer;
- foaming polyurethane foam (PPU) - a rigid material, applied to the surface in a continuous layer up to 60 mm thick. A big plus is the absence of cold bridges. Minus - special equipment is required for spraying. It is impossible to carry out the work independently.
An example of an estimate for insulating a balcony
This is just an example of a balcony in Vladimir. For a full calculation taking into account your wishes and the scope of dismantling work, a surveyor’s visit is required. We work on weekends by prior arrangement.
In Soviet times, almost no one paid attention to the balcony. In other words, he is there and okay. For many, it then served as a smoking area or an area where they could place items that were not susceptible to frost and precipitation.
But time passed, and the 90s arrived. And then that's it more people started paying attention to these extra square meters . Someone began to consider the balcony as an additional cellar, since they had to survive only at the expense of their harvest. Someone wanted to make an additional warm room in the apartment from the balcony and use it, for example, for an office. And someone decided to combine a summer room with an adjacent room in order to increase the size of the latter.
All the desires described above are still present in people today. And their implementation, as then, is impossible without transforming the balcony into a loggia. And this already requires some financial costs. The only question is: “Which ones?”
In order to be able to get an idea of how much money will be needed to repair the loggia, below is an example of an estimate for this event.
Loggia parameters taken into account in the estimate:
- Area - 5.1 sq.m.
- Ceiling height - 2.8 m.
- Glazing of the loggia - 1.7x4.2 m or 7.14 sq.m.
- Glazing on the side of the room - 4.05 sq.m.
Plan
An example of an estimate for the repair of a loggia
Note: The estimate shows average prices for Russia for 2015.
Sample ready estimate for repair and finishing work in an apartment with a total area of 64 m2 in a new building at the address: residential complex "Finsky-Potapovo microdistrict 3A".
Estimate No. 4 for repair and finishing work
Estimate for the purchase of rough materials
№ | Name of works | Unit change | Qty |
Price in rub. |
Price in rub. |
Dismantling works | |||||
1 | Joining ceiling seams(Rustov) | p.m. | 8 | 150 | 1200 |
2 | Dismantling sockets, switches, lamps | PC. | 12 | 75 | 900 |
3 | Dismantling the electrical panel assembly | PC. | 1 | 650 | 650 |
Total: | 2 750 | ||||
Construction works | |||||
1 | Laying partitions from tongue-and-groove blocks or foam concrete up to 100 mm thick | sq.m | 5,8 | 420 | 2436 |
2 | Device metal jumper | p.m. | 2 | 280 | 560 |
3 | Construction of a bathtub screen made of blocks | PC. | 1 | 1100 | 1100 |
4 | Vapor thermal insulation device ("penofol", "penoplex") balcony - floor, ceiling, walls | sq.m | 27 | 360 | 9720 |
5 | Coating thermal insulation device "Akterm" | sq.m | 0 | 180 | 0 |
6 | Waterproofing of joints adjacent to the street | sq.m | 6 | 185 | 1110 |
Total: | 14 926 | ||||
Painting and plastering works | |||||
1 | Plastering walls (along beacons) up to 20 mm | sq.m | 25 | 385 | 9625 |
2 | Leveling walls (usually) up to 10 mm - rooms, kitchen, corridor, storage room | sq.m | 154,5 | 200 | 30900 |
3 | Leveling ceilings (usually) up to 10 mm kitchen, corridor, pantry, balcony | sq.m | 28 | 250 | 7000 |
4 | Sealing ceiling seams (rusts) | p.m. | 8 | 150 | 1200 |
5 | Surface primer (2 layers) ceiling, walls | sq.m | 0 | 60 | 0 |
6 | Final sanding of surfaces - ceiling, walls | sq.m | 0 | 45 | 0 |
7 | Puttying ceilings for painting (set of works) kitchen, corridor, pantry, balcony | sq.m | 28 | 350 | 9800 |
8 | Painting ceilings with high-quality paint in 2 times | sq.m | 28 | 180 | 5040 |
9 | Puttying walls for painting (set of works) | sq.m | 154,5 | 280 | 44805 |
10 | Painting walls with high-quality paint in 2 times | sq.m | 154,5 | 140 | 21630 |
11 | Plastering window slopes up to 300 mm | p.m. | 15 | 260 | 3900 |
12 | Puttying slopes for painting (set of works) | p.m. | 15 | 280 | 4200 |
13 | Painting slopes with high-quality paint in 2 times | p.m. | 15 | 180 | 2700 |
14 | Installation of arched painting corners with sealing of seams and joints | p.m. | 22 | 65 | 1430 |
15 | Painting of pipes with a diameter of up to 50 mm | p.m. | 26 | 120 | 3120 |
Total: | 145 350 | ||||
Carpentry work | |||||
1 | Installation door block(ready set) | PC. | 5 | 3000 | 15000 |
2 | Device slatted ceilings(up to 10 sq.m) | sq.m | 4,4 | 880 | 3872 |
3 | Installation plastic window sills up to 300 mm | p.m. | 4,5 | 750 | 3375 |
Total: | 22 247 | ||||
Tile work | |||||
1 | Wall tiling (size 250-250 mm) bath, toilet | sq.m | 25 | 850 | 21250 |
2 | Hatch installation | PC. | 1 | 418 | 418 |
3 | Construction of a tile hatch (with installation of a mechanism) | PC | 1 | 1100 | 1100 |
4 | Laying tiles on the floor (size 300-300 mm) bath, toilet, balcony | sq.m | 10 | 700 | 7000 |
5 | Drilling holes in tiles | PC. | 12 | 160 | 1920 |
6 | Grouting ceramic tiles (monocolor) | sq.m | 35 | 100 | 3500 |
7 | Tile threshold cladding | p.m. | 1 | 1000 | 1000 |
Total: | 36 188 | ||||
Floor installation | |||||
1 | Waterproofing of floors in bathrooms | sq.m | 4,4 | 185 | 814 |
2 | Leveling screed device up to 3 mm | sq.m | 54,4 | 150 | 8160 |
3 | Laying laminate (with backing) | sq.m | 54,4 | 280 | 15232 |
4 | Threshold installation | p.m. | 3 | 150 | 450 |
5 | Installation of skirting boards | p.m. | 65 | 130 | 8450 |
Total: | 33 106 | ||||
Ventilation work | |||||
1 | Insert into the ventilation duct | PC. | 1 | 319 | 319 |
2 | Installation ventilation duct(up to 2 m) | PC | 2 | 1650 | 3300 |
3 | Fan installation (with connection) | PC. | 2 | 308 | 616 |
Total: | 4 235 | ||||
Heating | |||||
1 | Remaking the heating radiator supply unit | PC. | 3 | 4500 | 13500 |
2 | Installing a heating radiator | PC. | 3 | 1500 | 4500 |
3 | Removing/installing the radiator for finishing work (without dismantling the bracket to the finished location) | PC. | 3 | 500 | 1500 |
Total: | 19 500 | ||||
Plumbing work | |||||
1 | Temporary water supply device | set | 1 | 1650 | 1650 |
2 | Installation of a plumbing fine | p.m. | 6 | 600 | 3600 |
3 | Sealing a plumbing fine | p.m. | 6 | 120 | 720 |
4 | Installation of a fine filter with a pressure regulator | PC. | 2 | 1400 | 2800 |
5 | Collector installation (work package) | PC. | 2 | 2000 | 4000 |
6 | Laying of HGV pipes (m/layer, p/propylene, p/ethylene) | p.m. | 26 | 270 | 7020 |
7 | Pad sewer pipes(PVC) | p.m. | 5 | 330 | 1650 |
8 | Thermal insulation of pipes | p.m. | 26 | 50 | 1300 |
9 | Installation storage water heater(boiler) | PC. | 1 | 3300 | 3300 |
10 | Installation of the Compact toilet | PC. | 1 | 2805 | 2805 |
11 | Installation of "moidodyr" | PC. | 1 | 3000 | 3000 |
12 | Mixer installation | PC. | 1 | 850 | 850 |
13 | Installation hygienic shower | PC. | 1 | 850 | 850 |
14 | Installation of a heated towel rail | PC. | 1 | 3300 | 3300 |
15 | Bath installation | PC. | 1 | 3700 | 3700 |
16 | Installing a Bathtub Faucet on a Rod | PC. | 1 | 1250 | 1250 |
Total: | 41 795 | ||||
Electric installation work | |||||
1 | Installation of fines up to 30x30 mm | p.m. | 16 | 275 | 4400 |
2 | Sealing the fine | p.m. | 16 | 35 | 560 |
3 | Cabling | p.m. | 255 | 50 | 12750 |
4 | Installation of a socket box (with a socket device) | PC. | 33 | 300 | 9900 |
5 | Installation of overhead electrical distribution board | PC. | 2 | 650 | 1300 |
6 | Installation of circuit breakers, differential circuit breakers, RCDs | PC. | 12 | 250 | 3000 |
7 | Installation of socket, switch | PC. | 30 | 130 | 3900 |
8 | Installation of TV, Telephone, Internet sockets | PC. | 3 | 180 | 540 |
9 | Installation of TV, Telephone, Internet splitter | PC. | 1 | 280 | 280 |
10 | Installation of a built-in (spot) lamp | PC. | 6 | 200 | 1200 |
11 | Electrical device heated floors | sq.m | 2 | 750 | 1500 |
12 | Installation of underfloor heating relay | PC. | 1 | 350 | 350 |
13 | Marking electrical installation locations (without design) | PC. | 33 | 35 | 1155 |
Total: | 40 835 | ||||
Total for work: | 360 932 | ||||
Total according to estimate No. 4: | 360 932 |
Table No. 1 of consumption rough material.
Table No. 1 according to the consumption of construction and finishing rough materials in an apartment with a total area of 64 m2, a new building at the address: residential complex "Finsky-Potapovo microdistrict 3A".
Examples of a table for recording the consumption of rough material
№ |
Name material |
pcs/m2 bags |
price |
general price |
1 | “Rodband” mixture with a layer thickness of no more than 2 cm | 87 | 370 | 32190 |
2 | Sand concrete M300 with a screed layer thickness of no more than 5 cm | 145 | 160 | 23200 |
3 | Lighthouse plaster 0.6 | 45 | 40 | 1800 |
4 | Lighthouse plaster 1.0 | 12 | 45 | 540 |
5 | Betokontakt "EURO" | 3 | 1350 | 4050 |
6 | Primer "Prospectors" | 5 | 450 | 2250 |
7 | Foam block No. 5 in pieces | 6 | 45 | 270 |
8 | Foam block No. 7 in pieces | 84 | 55 | 4620 |
9 | Moisture-resistant plasterboard 12 | 2 | 370 | 740 |
10 | Gypsum putty "Fugenfühler" | 1 | 750 | 750 |
11 | Assembly adhesive for Perlfix blocks | 3 | 320 | 960 |
12 | Tile adhesive "Flizen" | 6 | 350 | 2100 |
13 | Self-leveling floor "Prospectors" | 8 | 320 | 2560 |
14 | Putty "Vetonit" LR+ | 9 | 750 | 6750 |
15 | Spider web "Oscar" 50m2 | 1 | 1150 | 1150 |
16 | Profile 27/28 "Knauf" | 6 | 100 | 600 |
17 | Profile 60/27 "Knauf" | 4 | 130 | 520 |
18 | Finishing putty "Pro Form" | 1 | 1350 | 1350 |
19 | Pendant "Knauf" | 40 | 20 | 800 |
20 | Film -150 density | 60 | 50 | 3000 |
21 | Planed timber 50/50 | 3 | 200 | 600 |
22 | Planed board 150/20 | 3 | 300 | 900 |
23 | Garbage bags | 120 | 10 | 1200 |
24 | Glue for cobwebs "Oscar" | 1 | 1350 | 1350 |
25 | Coating waterproofing "Ceresit 65" | 6 | 750 | 4500 |
26 | Rule 2.5 | 1 | 500 | 500 |
27 | Rule 2.0 | 1 | 400 | 400 |
28 | Rule 1.5 | 1 | 300 | 300 |
29 | Dowel nail 60/40 | 2 | 250 | 500 |
30 | Facade mesh 160 density | 1 | 1250 | 1250 |
31 | Putty "Uniflot-Knauf" | 1 | 1100 | 1100 |
32 | Bucket 12 liters | 2 | 120 | 240 |
33 | Bucket 20 liters | 2 | 180 | 360 |
34 | Tank 60 liters | 1 | 350 | 350 |
35 | Paper masking tape | 5 | 70 | 350 |
36 | Packing tape | 2 | 70 | 140 |
37 | Self-tapping screws 0.35 universal | 2 | 130 | 260 |
38 | Self-tapping screws 0.65 for wood | 1 | 130 | 130 |
39 | Self-tapping screws 0.75 for wood | 1 | 130 | 130 |
40 | Self-tapping screws 0.25 universal | 2 | 130 | 260 |
41 | Painting corner galvanized | 18 | 35 | 630 |
42 | Alabaster in bags | 1 | 280 | 280 |
43 | Silicone in tube | 1 | 140 | 140 |
44 | Glue in a tube "FixAll" | 1 | 420 | 420 |
45 | Crosses 1.5 for tile joints | 4 | 100 | 400 |
46 | Wedges for tile joints | 2 | 100 | 200 |
47 | Cable NUM 3/1.5 "Sevkabel" | 100 | 35 | 3500 |
48 | Cable NUM 3/2.5 "Sevkabel" | 150 | 47 | 7050 |
49 | Cable NUM 3/4 "Sevkabel" | 36 | 82 | 2952 |
50 | Cable NUM 3/6 "Sevkabel" | 5 | 95 | 475 |
51 | Corrugation 16 | 100 | 3 | 300 |
52 | Corrugation 20 | 200 | 4 | 800 |
53 | Internet cable "FTP" | 10 | 22 | 220 |
54 | TV cable "SAT 703" | 40 | 25 | 1000 |
55 | Telephone cable "KSPV" | 10 | 12 | 120 |
56 | Crab TV 1/3 | 1 | 250 | 250 |
57 | Insulating tape | 1 | 40 | 40 |
58 | Punched tape | 1 | 180 | 180 |
59 | Lamp 150v | 5 | 40 | 200 |
60 | Socket boxes for concrete | 50 | 10 | 500 |
61 | Automatic 10 amp. "ABB" | 2 | 150 | 300 |
62 | Automatic 16 amp. "ABB" | 3 | 150 | 450 |
63 | Automatic 25 amp. "ABB" | 5 | 150 | 750 |
64 | RCD "ABB" | 1 | 1250 | 1250 |
65 | DIF automatic 25 amp. | 1 | 1350 | 1350 |
66 | Armature 12 | 3 | 220 | 660 |
67 | ||||
68 | Lifting material "in tons" | 8 | 1500 | 12000 |
69 | Delivery of materials "gazelle" | 4 | 1500 | 6000 |
70 | Total: | 147 787 |