technological parameters and mutual control of operating modes.
Technological complex, including up to 10 units
pcs."1set*
01-13-030-0G1 "Centralized (dispatcher) control systems
areas included in the general technological complex. Technological
complex, including managed areas in the amount of up to 5
pcsLset*
11.1.9. Estimate No. 9. Initial data
Yu"""BUS SYSTEM 10KV""9"COMMISSIONING WORKS ON ELECTRICAL EQUIPMENT AND
FOR RPA DEVICES FEDERAL UNIT PRICES FOR COMMISSIONING WORK
FERp-2001. COLLECTION N1. ELECTRICAL DEVICES. TYPICAL DIAGRAM (OR
CIPHER OF A SPECIFIC SCHEME)" *
148


The note line (P) indicates:
P ADJUSTMENT WORK. THE ESTIMATE TAKES ACCOUNT OF THE OVERHEAD COST RATES OF 65% (MDS 81
-33.2004.APP.4.P48), ESTIMATED PROFIT 60% (MDS-25.2001
.APP.Z,P48).OP.2.1 .T1 .P5. PERFORMANCE OF COMMISSIONING WORKS IN
ELECTRICAL INSTALLATIONS UNDER VOLTAGE WITH DESIGN
OF PERMISSION OR DISPOSAL COEFFICIENT 1.3 AT 85% OF COST K= 1.255
(K=1+0.3.0.85=1.255). INDICES OF CONVERSION OF THE ESTIMATED COST OF CONSTRUCTION
INSTALLATION WORK PERFORMED WITH THE INVOLVEMENT OF FUNDS OF THE FEDERAL BUDGET,
IN THE CITY OF MOSCOW FOR FER-2001 PRICES. ENTERED INTO EFFECTIVENESS BY THE LETTER OF THE GOSSTROYA OF THE RF
AS OF DECEMBER 2004 (K=4.98)*
01-03-002-04 "2" Switch with voltage up to 1 kV three-pole with
electromagnetic, thermal or combined release, rated
current up to 50 A" pcs.*
01-04-034-02"1 "Complete devices protection and automation series SPAC-
800"set*
01 -04-063-0 I "Arc protection of complete distribution sections
devices (KRU) "set*
01-05-023-02 "1" AChR device with subsequent autorecloser after restoration
frequency "device*
01-06-020-03"2"Secondary circuits of three-voltage transformer
phase "system*
01 -06-021-01"2"Wiring diagram of a three-wire system with the number
panels (cabinets, cells) up to 2" diagram*
01-06-021-02"2"Wiring diagram of a three-wire system, for each

01-06-021-0G5 "Wiring diagram of a three-wire system with the number of panels
(cabinets, cells) up to 2" circuit*
01-06-021-02 "65" Wiring diagram of a three-wire system, for each
subsequent panel (cabinet, cell) over 2" diagram*
01-06-022-01 "5" Power redundancy circuit for a three-wire system from
another power source with a manual switch device"-diagram*
01 -06-023-01 "1 "Device for monitoring the voltage level of alternating or
rectified operating current "device*
01 -09-001-01"3 "Mechanical contact sensor with a number of control circuits
up to 2" pcs.*
01-09-010-03"1"Functional relay contactor control group with
total number of external interlocking connections up to 10" pcs.*
149
A guide to preparing estimates (estimates)
on commissioning works on electrical devices

Z"pcs.*
01-09-002-01 "3" Non-contact analogue sensor with input-output number up to
Z"pcs.*
01-09-011-02"2" Functional control group analogue non-contact
with a total number of elements and settings up to 5" pcs.*
01-10-001-01 "12" Collection and implementation of information signals from protection devices,

01-10-002-01 "4" Scheme of the formation of the signaling section (central,
technological, local, emergency, warning, etc.) "section*
01-10-003-01 "G" Shield mnemonic diagram dispatch control with quantity
received signals up to 50" circuit*
01-10-010-01 "G" Insulation monitoring circuit electrical network by using
electrical measuring instruments "diagram*
01-10-010-02"1 "Scheme for monitoring the insulation of an electrical network using
relay contactor equipment and contactless elements - diagram*
01-10-001-01 "15" Collection and implementation of information signals from protection devices,
automation of electrical and technological modes "signal*
01-10-001-01"6"Collection and implementation of information signals from protection devices,
automation of electrical and technological modes "signal*
The following prices are applied with a coefficient K=1.255, for payment and
labor costs:
01-02-016-02 "1" Three-phase voltage transformer with voltage up to 11
kV"pcs.*
01-11-010-03"1"Measurement of current flow resistance of a circuit with
diagonal, m, up to 200"1meas.*
01-11-011-0G0.82"Checking the presence of a circuit between grounding conductors and grounded
elements of "Yuotochek*
01-11-024-02"6"Phasing of an electric line or transformer with a network
voltage, kV, St. 1"1phase*
01-11-026-02"12"Retrieval, processing and analysis of vector diagrams"1diagr.*
01-11-028-01 "2" Measuring insulation resistance with a megohmmeter of cable and
other lines with voltage up to 1 kV intended for transmission
electricity to switchgears, switchboards, cabinets,
switching devices and electrical consumers"1 line*
150
"MO-" ¦ Off."
A guide to preparing estimates (estimates)

Table 1-143

Functional control groups analog?? contactless

Standards for 1 piece.

Table 1-144

Functional control groups are discrete?? contactless

Standards for 1 piece.

Table 1-145

Circuits of automatic control systems

Standards for 1 piece.

SECTION 10. DEVICES AND DIAGRAMS OF SIGNALING

Introductory instructions

1. This section provides standards for labor costs for commissioning work for independent schemes alarm systems (central, technological, local, emergency, warning, etc.), including light and sound signals, as well as electrical network insulation monitoring circuits.

2. The standards, in addition to those listed in clause 6 of the technical part, take into account the costs of the following commissioning work, carried out in accordance with the requirements of the rules for electrical installations, as well as SNiP 3.05.06-85 “Electrical devices”:

checking and setting up relay contactor equipment;

setting time relay settings;

setting up flashing light devices;

testing of devices and alarm circuits for operation.

3. The standards do not take into account and should be determined additionally according to the standards of other departments of the collection, the costs of commissioning work for:

switching devices and their secondary switching circuits - in department 3;

signaling circuit wiring diagrams - according to department 6;

sensors from which the signal enters the circuit automatic control, - for department 9;

high voltage tests - according to department 12.

4. The scope of work according to table. 1-146 includes checking the signaling circuits from the first intermediate terminal block of the devices generating the signal to the signaling section by creating a mode or their artificial imitation(in the absence of a signal implementation area, it is carried out directly to the light or sound signal).

5. The scope of work according to table. 1-147 includes setting up the alarm section equipment and ensuring the functioning of light, sound and other alarms (including the RIS relay).

6. The standards of this department are calculated based on the conditions for commissioning work to be carried out by the following qualification team:

Section 1. ALARM DIAGRAMS

Table 1-146

Schemes for collecting and implementing information signals

Norm for 1 signal

Table 1-147

Schemes for the formation of a signaling section

Norm for 1 plot

Table 1-148

Mnemonic diagrams of the dispatch control panel

Norm for 1 scheme

Section 2. ELECTRICAL NETWORK ISOLATION CONTROL DIAGRAMS

Table 1-149

Electrical network insulation monitoring circuits

Norm for 1 scheme

SECTION 11. MEASUREMENTS IN ELECTRICAL INSTALLATIONS

Introductory instructions

1. This section provides standards for labor costs for testing and measurements in electrical installations and on electrical cables in accordance with the requirements of the rules for the installation of electrical installations, SNiP 3.05.06-85 “Electrical devices”, as well as the “Rules technical operation(PTE) of electrical installations of consumers" and "Safety rules for electrical installations of consumers".

2. This department provides cost standards for work that is not included in the commissioning work of other departments of the collection, as well as for repeated measurements.

3. The standards, in addition to those listed in clause 6 of the technical part, take into account labor costs for the following commissioning work:

choice of measurement method;

assembly and disassembly of test and measurement circuits;

ensuring safety measures at the test (measurement) object;

production of measurements.

4. The standards from 1-152-2 to 1-152-5, 1-154-1, 1-156-1 take into account the labor costs for installing auxiliary electrodes and their connection with measuring instruments and measured objects.

5. Labor costs for measuring insulation resistance electric machines, transformers, switching devices, relay protection and automation devices, voltage and operational current circuits, static converters, as well as devices for automatic control systems for electric drives are taken into account in the standards for setting up the above-listed devices, devices and control systems in the relevant sections of this collection and additionally hereunder department 11 are not determined.

Labor costs for measuring the insulation resistance of control cables between consoles, panels, cabinets, control stations, as well as between individual devices are taken into account in the commissioning standards:

functional groups as part of automatic control and regulation systems - in department 9;

secondary switching circuits of power plants and substations - according to the relevant sections of this collection.

Additionally, according to this section, labor costs for these works are not determined.

6. Labor costs for measuring the insulation resistance of power wiring from the starting device to the current collector are determined in the following order:

if the current collector is an electric motor or solenoid, then labor costs are taken into account by the standard for commissioning work for the specified equipment in department 7 and are not additionally determined in department 11;

if the current collector is a transformer or other electrical device taken into account in the nomenclature of this collection, then labor costs are taken into account by the standards of commissioning work in department 2 and are not additionally determined in department 11;

if the current collector is an active resistance or another electrical device that is not taken into account in the nomenclature of this collection, then labor costs should be determined according to standard 1-163-1 of this department;

for power wiring from the cabinet to the starting device (line), labor costs should also be determined according to standard 1-163-1.

7. The standards of this department are calculated based on the conditions for commissioning work to be carried out by a unit of the following qualifications:

Section 1. CABLE WORK

Table 1-150

Finding and determining the location of cable damage with burning

Standards for 1 cable

Table 1-151

Determination of active resistance or working

electrical capacitance of the cable core

Standards for 1 measurement

Section 2. GROUNDING DEVICES

Table 1-152

Current flow resistance measurements

Standards for 1 measurement

Table 1-153

Checking the presence of a circuit between ground electrodes

and grounded elements

Norm for 100 points

Table 1-154

Definition resistivity soil

Norm for 1 measurement

1. This section provides standards for labor costs for commissioning work for independent signaling circuits (central, technological, local, emergency, warning, etc.), including light and sound signals, as well as electrical network insulation monitoring circuits.

2. The standards, in addition to those listed in clause 6 of the technical part, take into account the costs of the following commissioning work, carried out in accordance with the requirements of the rules for electrical installations, as well as SNiP 3.05.06-85 “Electrical devices”:

checking and setting up relay contactor equipment;

setting time relay settings;

setting up flashing light devices;

testing of devices and alarm circuits for operation.

3. The standards do not take into account and should be determined additionally according to the standards of other departments of the collection, the costs of commissioning work for:

switching devices and their secondary switching circuits - in department 3;

signaling circuit wiring diagrams - according to department 6;

sensors from which the signal enters the automatic control circuit - in section 9;

high voltage tests - according to department 12.

4. The scope of work according to table. 1-146 includes checking the signaling circuits from the first intermediate terminal block of the devices that generate the signal to the signaling section by creating a mode or their artificial imitation (in the absence of a signal implementation section, it is carried out directly on the light or sound signal).

5. The scope of work according to table. 1-147 includes setting up the alarm section equipment and ensuring the functioning of light, sound and other alarms (including the RIS relay).

6. The standards of this department are calculated based on the conditions for commissioning work to be carried out by the following qualification team:

Section 1. ALARM DIAGRAMS

Table 1-146

Schemes for collecting and implementing information signals

Norm for 1 signal

Table 1-147

Schemes for the formation of a signaling section

Norm for 1 plot

Table 1-148

Mnemonic diagrams of the dispatch control panel

Norm for 1 scheme


Mnemonic diagram with the number of received signals

Elements of costs (resources)

Unit

before

for every 100

measurements

50

100

200

subsequent signals

1-148-1

1-148-2

1-148-3

1-148-4

Labor costs of commissioning personnel

person-hour

171

232

389

168
Home > Document

11 DEVICES AND ALARM DIAGRAMS

11.1 Introductory notes

11.1.1 This section provides labor cost standards for commissioning work for independent signaling circuits (central, technological, local, emergency, warning, etc.), including light and sound signals, as well as electrical network insulation monitoring circuits. 11.1.2 In standards other than those listed in clause 1.6 technical part, the costs of the following commissioning work are taken into account, carried out in accordance with the requirements of the Rules for Electrical Installations, as well as SNiP 3.05.06-85 “Electrical Devices”: - checking and setting up relay contactor and contactless equipment; - setting time relay settings; - setting up flashing light devices; - testing of devices and signaling circuits for operation.

11.1.3. The standards do not take into account and must be determined additionally according to the standards of other sections of the Collection of costs for commissioning work for: - switching devices and their secondary switching circuits -according to standards groups from 15 to 19; - signaling circuit wiring diagrams - according to the standards of groups 41 to 42; - sensors from which the signal enters the automatic control circuit - according to the standards of groups 51 to 53; - high voltage tests - according to the standards of group 71. 11.1.4 The scope of work in accordance with standard 1-58-1 includes checking the signaling circuits from the first intermediate terminal block of the devices generating the signal to the signaling section by creating modes or their artificial imitation (with in the absence of a signal implementation area, it is carried out directly on the light or sound signal). 11.1.5 The scope of work in accordance with standard 1-58-2 includes setting up the equipment of the signaling section and ensuring the functioning of light, sound and other signaling (including the RIS relay).

Group 58 Signaling Schemes

Meter: signal (norm 1-58-1); section (norm 1-58-2); scheme (standards 1-58-3 – 1-58-6, 1-59-1, 1-59-2). Group 58 (standards 1 to 6)

Resource name

Unit

Scheme for collecting and implementing information signals from protection devices, automation of electrical and technological modes

Scheme of formation of a signaling area (central, technological, local, emergency, warning, etc.)

Mnemonic diagram of the dispatch control panel with the number of received signals

for every 100 subsequent signals

Group 59 Electrical network insulation monitoring circuits

Meter: circuit Group 59 (standards 1 to 2)

Resource name

Unit

Control circuit

using electrical measuring instruments

using relay-contactor equipment and non-contact elements

Labor costs of commissioning personnel

12 MEASUREMENTS IN ELECTRICAL INSTALLATIONS

12.1 Introductory notes

12.1.1 This section provides standards for labor costs for testing and measurements in electrical installations and on electrical cables in accordance with the requirements of the Rules for the Construction of Electrical Installations, SNiP 3.05.06-85 “Electrical Devices”, as well as “Rules of Technical operation (PTE) of consumer electrical installations" and "Safety rules for the operation of consumer electrical installations" (1998, Kiev). 12.1.2 This section provides cost standards for work that is not included in the commissioning work of other sections of the Collection, as well as for repeated measurements. 12.1.3 In standards other than those listed in clause 1.6 works listed in clause 1.5 The technical part of the Collection takes into account the labor costs for the following commissioning works: - selection of the measurement method; - assembly and disassembly of test and measurement circuits; - provision of labor protection measures at the test (measurement) site; - production of measurements.

12.1.4 The standards from 1-61-1 to 1-61-5, 1-61-7, 1-61-9 take into account the labor costs for installing auxiliary electrodes and their connection to measuring instruments and measured objects. 12.1.5 Labor costs for measuring the insulation resistance of electrical machines, transformers, switching devices, protection and automation devices, voltage and operational current circuits, static converters, as well as devices for automatic control systems for electric drives are taken into account in the standards for setting up transmissions the above numerical devices, devices and control systems for the corresponding sections of this Collection and additionally for this section are not defined.

Group 60 Cable work

Meter: cable (standards 1-60-1 - 1-60-3); measurement (standards 1-60-4, 1-60-5)

Group 60 (standards 1 to 5)

Resource name

Unit

Finding and determining the location of damaged cable with life, cable length, m

Determination of active resistance or working electrical capacitance of a cable core at voltage, kV

for every subsequent 500 m

Group 61 Grounding devices

Meter: measurement (standards 1-61-1 - 1-61-5, 1-61-7); 100 points (norm 1-61-6); pantograph (norm 1-61-8); touch point (1-61-9)

Group 61 (standards 1 to 5)

Resource name

Unit

Measuring resistance to current flow

ground electrode

contour with diagonal, m

Labor costs of commissioning personnel

End of group 61 (norms 6 to 9)

Resource name

Unit

Checking the presence of a circuit between grounding conductors and grounded elements

Determination of soil resistivity

Measuring the impedance of the phase-zero circuit

Characterization to determine touch voltage at points specified in the project

Labor costs of commissioning personnel

Group 62 Other measurements

Meter: measurement (standards 1-62-1 - 1-62-5, 1-62-7, 1-62-10, 1-62-11, 1-62-14, 1-62-16); characteristics (standard 1-62-6); phasing (standards 1-62-8, 1-62-9); oscillogram (norm 1-62-12); diagram (norm 1-62-13); line (norm 1-62-15); test (standards 1-62-17, 1-62-18). Group 62 (standards 1 to 5)

Resource name

Unit

Measuring the tangent of the dielectric loss angle

Measurement of transient resistances DC voltage distribution device bus contacts, kV

Measurement of active, inductive resistance and capacitance of electrical machines and devices

Labor costs of commissioning personnel

Note. Standard 1-62-5 applies only to electrical machines and devices installed in power circuits.

Continuation of group 62 (norms 6 to 10)

Resource name

Unit

Removing temporary characteristics

Removing speed characteristics of switching devices

Phasing of an electric line or transformer with network voltage, kV

Measurement of absorption coefficient (P60/P15) of windings of transformers and electrical machines

Labor costs of commissioning personnel

Continuation of group 62 (norms 11 to 14)

Resource name

Unit

Measuring the nonlinearity coefficient of insulation of an electrical machine

Recording, processing and analysis of oscillograms

Reproduction and analysis of vector diagrams

Measuring leakage currents or breakdown voltage of a surge arrester or leakage currents of a voltage limiter

Labor costs of commissioning personnel

End of group 62 (norm 15 to 18)

Resource name

Unit

Measuring insulation resistance with a megohmmeter

Testing for free flow of transformer oil and measuring the impregnation coefficient of the cable line low pressure(hydraulic and impregnation tests)

Oil breakdown test

cable and other lines with voltage up to 1 kV, intended for transmitting electricity to switchgears, switchboards, cabinets and switching devices

winding of machines, devices and wires

Labor costs of commissioning personnel 1.1 This Collection contains resource elements estimate standards for commissioning work (RESNpn), necessary to determine the need for labor costs when performing commissioning work on refrigeration, compressor and carbon dioxide

  • Rules for determining the cost of construction dbn d 1-1-2000 as amended in accordance with Addendum No. 3, approved by order (1)

    Document

    2.12 ADDITIONAL REQUIREMENTS FOR THE DEVELOPMENT OF ESTIMATE DOCUMENTATION FOR EXPANSION, RECONSTRUCTION AND TECHNICAL RE-EQUIPMENT OF ENTERPRISES, BUILDINGS AND STRUCTURES 30

  • Introductory instructions

    1. This section provides prices for commissioning work for independent alarm circuits (central, technological, local, emergency, warning, etc.), including light and sound signals, as well as electrical network insulation monitoring circuits.

    2. The prices take into account the costs of the following commissioning work, carried out in accordance with the requirements of the “Rules for the Construction of Electrical Installations”, as well as SNiP 3.05.06-85 “Electrical Devices”:

    checking and adjusting relays and equipment;

    setting up flashing light devices;

    testing of devices and alarm circuits for operation.

    3. The prices do not take into account and should be determined additionally based on the prices of other departments of the Collection of costs for commissioning work for:

    switching devices and their secondary switching circuits - in department 03;

    alarm circuit wiring diagrams - according to department 06;

    sensors from which the signal enters the automatic control circuit - in section 09;

    high voltage tests according to department 12.

    Pricing code

    Labor costs, person-hours

    Section 1. ALARM DIAGRAMS

    Table Schemes for collecting and implementing information signals

    Meter: signal

    Collection and implementation of information signals from protection devices, automation of electrical and technological modes

    Table Schemes for the formation of a signaling section

    Meter: plot

    Scheme of formation of an alarm section (central, technological, local, emergency, warning, etc.)

    Table Mnemonic diagrams of the dispatch control panel

    Meter: diagram (prices from 01 to 03); 100 signals (rate 04)

    Mnemonic diagram of the dispatch control panel with the number of received signals up to:

    for every 100 subsequent signals add 03 to the price

    Section 2. ELECTRICAL NETWORK ISOLATION CONTROL DIAGRAMS

    Table Scheme for monitoring the insulation of the electrical network

    Meter: circuit

    Control circuit:

    using electrical measuring instruments

    using relay-contactor equipment and non-contact elements

    SECTION 11. MEASUREMENTS IN ELECTRICAL INSTALLATIONS


    Introductory instructions

    1. This section provides prices for special tests and measurements during the work on electrical cables and electrical installations.

    2. The prices take into account labor costs for the following commissioning work, carried out in accordance with the requirements of the “Rules for the Construction of Electrical Installations”, as well as SNiP 3.05.06-85 “Electrical Devices”:

    choice of measurement method;

    assembly and disassembly of test circuits;

    provision of special safety measures at the test (measurement) site;

    production of measurements.

    3. Prices from 2 to 5, 1, 1 take into account the costs of installing auxiliary electrodes and their connection to measuring instruments and the measured object.

    4. Prices table. applies only to electrical machines and devices installed in power circuits.

    5. For this department, prices for commissioning work are determined that are not taken into account by prices for other departments of the Collection.

    6. Price 1 takes into account the costs of performing work for a three-wire line. For two-wire or four-wire lines, the rate should be determined at rate 1 with a coefficient of 0.7 and 1.3, respectively.

    Pricing code

    Name and technical specifications equipment

    Direct costs (commissioning personnel remuneration), rub.

    Labor costs, person-hours

    Section 1. CABLE WORK

    Table Finding and determining the location of cable damage with burning

    Meter:I cable (prices 01 and 02); 500 m of cable (price 3)

    Search and determination of the location of cable damage with burning, cable length, m, up to:

    for each subsequent 500 m add 02 to the price

    Table Determination of active resistance or working electrical capacitance of a cable core

    Meter: 1 measurement

    Determination of active resistance or working electrical capacitance of a cable core for voltage, kV, up to:

    Section 2. GROUNDING DEVICES

    Table Measuring current flow resistance

    Meter: 1 measurement

    Current flow resistance measurement:

    ground electrode

    contour with diagonal, m, up to:

    Table Checking the presence of a circuit between grounding conductors and grounded elements

    Measuring point

    Checking the presence of a circuit between grounding conductors and grounded elements

    Table Determination of soil resistivity

    Meter: 1 measurement

    Determination of soil resistivity

    Table Measuring the impedance of the phase-zero circuit

    Meter: 1 pantograph

    Measuring the impedance of the phase-zero circuit

    Table Characteristics for determining touch voltage

    Meter: 1 touch point

    Taking characteristics to determine the touch voltage at the points specified in the project in networks with a voltage of St. 1 kV

    Measuring touch voltage in 380/220 V networks with a solidly grounded neutral

    Section 3. OTHER MEASUREMENTS

    Table Measuring dielectric loss tangent

    Meter: 1 measurement

    Dielectric loss tangent measurement

    Table Measuring DC transient resistance

    Meter: 1 measurement

    Measurement of DC transient resistance of bus contacts of distribution devices with voltage, kV, up to:

    Table Measurement of active, inductive resistance, capacitance of electrical machines and devices

    Meter: 1 measurement

    Measurement of active, inductive resistance and capacitance of electrical machines and devices

    Characteristics table

    Meter: 1 characteristic

    Characterization of switching devices:

    temporary

    expressways

    Table Phasing of an electrical line or transformer

    Meter: 1 phasing

    Phasing of an electric line or transformer with a network voltage, kV:

    Table Measurement of absorption coefficient and insulation non-linearity

    Meter: 1 measurement

    Ratio measurement:

    absorption of windings of transformers and electrical machines

    nonlinearity of electrical machine insulation

    Table: Taking oscillograms and vector diagrams

    Meter:I oscillogram (rate 01); 1 diagram (price 02)

    Removal, processing and analysis:

    oscillogram

    vector diagrams

    Table Measuring leakage currents or breakdown voltage