The correctness of the prices for the repair of plaster of individual places. Plastering works - prices, recommendations of professionals Local estimate for the repair of plaster walls


Hello! I have such a question in the defective statement, the customer indicates the work of repairing plaster walls on brick individual places S up to 1m2 layer thickness up to 20 mm cement mortar. SOCr apply the rate 61-02-07. And if a d / w sounds the same work only with a dry mixture (dry repair mixture "Birs-30" then the SOCR is regarded as follows: plaster beating 46-02-009-02; continuous leveling of surfaces (single-layer plaster) from dry mortar mixtures more than 10 mm thick (up to 30 mm) d2 15-02-019-11. With the use of this, the labor intensity drops from 228.35 man-hours per 100 m2 to 82.1 man-hours per 100 m2. hence the cost of the work. Please tell me how correctly SOCr is acting using these on this work. If they are wrong, then how to prove it, based on what regulations.

Fair enough

Why is the diameter correct, because repair work and applying a solution from a dry mixture in one layer does not work, because. the material in any suchi shrinks and a hole is obtained at the site of the repaired section of the wall, and work on preparing the surface of the notch, spraying and additional falls out. layer of soil, if necessary, preparation (mixing) of the solution at the workplace.

I thought that it meant PZ * 3 yes there is no notch, but what kind of walls are there? This is taken into account

ALB, that's right! and this is correct! If you want to take it differently, fix the troubleshooting!

Incorrect. This is the same repair of plaster with the replacement of the mortar with a dry mix + preparation of the mixture + priming. Try to refer to SNiP 3.04.01-87 Table 10: the allowable thickness of a single-layer plaster is up to 20 mm. Everything above is within the framework of repairs and according to repair collections.

quote = Tatyana_K] Quote (ALB) And if a d / w sounds the same work only with a dry mixture (dry repair mixture "Beers -30" then the SOCR is regarded as follows: plastering 46-02-009-02; continuous leveling of surfaces (single-layer plaster ) from dry mortar mixtures with a thickness of more than 10 mm (up to 30 mm) d2 15-02-019-11 and here it’s right! If you want to take it differently, fix the troubleshooting! we work with the customer's materials.Accordingly, the customer needs to put in the material that he has stale in the warehouse.But the question is whether the SOCr is correctly used from the 15th collection for repair work?As far as I understand, the work described in the 15th collection should be performed in workshops (premises) decommissioned and, as an option, transferred to the contractor under the act. repair work in operating shops of the metallurgical industry. If I'm wrong about something, please correct me and explain if possible. Thanks in advance.

Therefore, the presence of sb.46 is inappropriate .. As well as continuous alignment as applied to this paragraph d.v. in view of the clearly defined boundaries of individual volumes and types of work. How will you compensate for the manual preparation of solutions, decide with the customer. Options Sat 6.69, calculation. The rest of the pearls about correctness .. let's leave on the conscience of inattentive reading and gaps in knowledge of the technology of plastering. You cannot turn a simple leveling (single-layer plaster) by a factor into a full-fledged plaster.

If you have a clear understanding of this issue, please advise how to properly prove this based on what regulatory documents. This is a very interesting question for me, since we constantly carry out this type of work, and this is another important factor (repairing the plaster of individual places), it is the main cost. And our estimators (SOKr) are very fond of the price of single-layer plaster, which they use it even for such work as the restoration of the protective layer concrete structures(beams, columns, floor slabs) with dry repair mixes "emako". So please kindly tell me how to deal with such injustice.

Do you have renovations or renovations? If repair work, then you should apply, if possible, a direct quotation from TERr (MDS 35) and only in the absence of sat. 46 and collections for new . It is necessary to find TTK for the work of these collections and prove the technology.

Construction company RPSK produces plastering work of any volume and on objects of any degree of complexity. We also perform plaster processing of architectural details of the interior and exterior - improved plastering of columns, pillars, flat and curved slopes, etc.

Depending on the purpose of the plaster and wall material buildings, the type of facade plastering is selected. Perhaps ordinary or decorative facade plastering. In addition, the specialists of our company carry out repairs and renovation of old plastered surfaces with their partial or complete replacement, for example, plaster ceiling repair separate places or wall plaster repair.

The construction company RPSK has years of experience in the field of plastering. Our staff consists of real professionals with excellent knowledge of their business and able to perform this difficult job with high quality. They know everything about plastering.

One of the most significant stages of finishing any premises is wall plastering. Whether you are renovating an old building or finishing an apartment in a new building, the main part of the preparation for wall plastering is plastering. High-quality, competent plastering of walls is not cheap, and can be two-thirds of the cost of all finishing works. Plastering quotes vary depending on the degree of complexity of the surface and on the type of plaster itself. But is it worth saving on quality in this matter, looking for workers with a dubious reputation, offering to cheaply perform “any repair work”?

Our company "showed itself" and the level of its skills, both at elite facilities and at large construction sites, where the main issue is the quality, time and full compliance of the plaster with the wishes of the customer, while strictly observing all the rules and requirements of construction and repair work. The plaster made by our specialists is favorably distinguished by its impeccable surface and strict adherence to standards when finishing wall corners. trust us plastering works, prices which are presented on our website, and we will perform them in good faith and with high quality. Production capacity construction company RPSK guarantees the performance of large volumes of screeds, painting and plastering works in residential multi-apartment buildings and non-residential premises.

Plastering quotes

Name of works unit of measurement price, rub.
Plastering walls under tiles m 2 200-250
Improved wall plastering m 2 300-360
Improved plaster ceiling m 2 350-400
Improved plastering of pillars, columns m 2 450-500
High quality wall plastering m 2 450-500
High quality plastered ceilings m 2 400-450
High-quality plastering of pillars, columns l.m. 550-600
High quality wall plastering m 2 380-420
Slope plastering l.m. 300-400
Slope putty l.m. 120-140
Decorative plaster m 2 400-500
Venetian plaster m 2 550-650
Repair of plaster ceilings in separate places m 2 350-400
Repair of plaster walls in separate places m 2 250-300
strobe l.m. 40-50
Sticking paint mesh under putty ceilings m 2 80-90
Sticking paint mesh under wall putty m 2 60-80
Installation of a plaster corner l.m. 40-60
Puttying window slopes l.m. 280-310
Ceiling putty m 2 160-240
Wall putty m 2 140-180
Puttying the joints of ceiling plinths joint 30-50
Puttying and gluing the seams with a sickle l.m. 30-40
Ceiling rustication l.m. 60-65
Ceiling rustication l.m. 150-170

Federal unit rates and state elemental estimated norms make it possible to draw up estimates for the repair of plaster, using current or basic prices. Thanks to these standards, you can easily calculate the amount of work and the required budget.

GESN for plastering work is a collection of state standards at number 61. The “General Instructions” provide explanations regarding the use of the document: how to determine the consumption of resources, what costs and in what cases are excluded, how to apply the standards if repairs are made on an area up to 5 m2, etc. The technical part of the document consists of 32 tables, which contain the cost standards for each element. In turn, the table consists of two, three or more parts, disclosing the costs by item, depending on the material used, the thickness of the plaster layer, the need for additional operations.
GESN includes sections on the repair of plaster applied to the following structures, surfaces and materials:

Local estimate for the repair of plaster walls

Repair of internal or external plastered walls is not a whim, but a necessity, especially for facades. Unfortunately, no one is immune from it either. Therefore, it is often necessary to draw up a local estimate for plaster repairs, which are either part of the whole project, or the whole repair consists of eliminating defects on the plaster walls. The estimate is a primary document and looks like a table of two columns related by meaning. In a local document, it is customary to group data by type of work, equipment, and structural elements repaired object. The estimate is made taking into account several factors, including:

  • scope of forthcoming actions;
  • the need for tools and equipment;
  • current spending standards;
  • real prices for work and equipment rental;
  • Cost of materials.

Expenses are usually divided into 4 categories:

  • equipment;
  • finishing;
  • installation work;
  • other items of expenditure.

Prices for repairing plaster walls in separate places


When it is necessary to repair the plaster coating not by continuous leveling, but on separate surfaces, when drawing up estimates, they are guided by tables 2,3,4 and 5 of the collection No. 61 FER. They contain an element-by-element indication of cost standards, while tables 2 and 3 are devoted to repairs internal walls(wooden, stone, concrete), and 4 and 5 touch the ceilings (wooden, stone, concrete). The following items are included in the expenses: wages of construction workers, auxiliary workers, machinists, equipment costs, materials (mortar, water), cleaning costs construction debris. Each element is assigned a unique code, thereby guaranteeing the accuracy of calculations.

Repair of plaster walls according to FER

Federal unit prices (FER texts) are a set of regulations governing prices for each item of expenditure, including for the repair of internal and facade plaster. The plaster book contains prices for all operations, including surface preparation and sorting of materials, fencing and direct repairs. Also, the standards of expenses for garbage collection, cleaning of unused material, protection and cleaning of glasses, instruments and products from plaster mortar. The document provides that the plaster is repaired by continuous leveling or by the area of ​​​​separate places. The FER text contains recommendations for calculating the repaired area and the procedure for determining the volume of plastering on various curved surfaces.